82594
SP Flare Tripods Ready for Installation
SP Flare Tripods Ready for Installation
Tuesday, February 27, 2018

South Pars Flare Tripods Ready for Installation

Tuesday, February 27, 2018

South Pars Flare Tripods Ready for Installation

Two tripods for the flare stacks of the South Pars phases 23 and 24 are ready to be installed in the Persian Gulf, the director of phases 22-24 said.

Farhad Izadjou added that the equipment will be dispatched by the Iranian Iran Marine Industrial Company's carrier CPad on Tuesday, the National Iranian Oil Company's portal reported.

Premium

Subscribe to the Financial Tribune to continue reading this article or Log in to your account if you are already a subscriber.

Find out more about our subsciption plans here.

Short URL : https://goo.gl/vjQuHd
02/27/2018
  1. https://goo.gl/koqP9E
  • https://goo.gl/5P1raq
  • https://goo.gl/73iwN5
  • https://goo.gl/tTd14U
  • https://goo.gl/SepbW2

You can also read ...

Iran's LPG Exports Fall to 356,000 Million Tons
Iran's LPG shipments loaded, or due for lifting, in September...
Canada to Boost Support for Renewable Energy
Millions of dollars in subsidies for a Nova Scotia tidal...
The field has cumulatively produced about 15 million cubic meters of gas and 31.4 million barrels of oil and condensate.
India’s Reliance Industries has shut down an oil and gas field...
Emirati Oil Company Hoarding Jet Fuel
Emirates National Oil Company has begun storing jet fuel on...
OPEC,  Non-OPEC Aug. Compliance  at 129%
An OPEC and non-OPEC monitoring committee found that oil...
Saudis, Russia Planning to  Replace Iran Oil Market Share
The joint OPEC and non-OPEC ministerial committee, aka JMMC,...
$30 Million for Mazandaran Gas Expansion  Scheme
Over 4.56 trillion rials ($30 million) have been allocated to...

Add new comment

Trending

Googleplus