61483
Early Production Starts in Ilam’s Azar Oilfield
Early Production Starts in Ilam’s Azar Oilfield

Early Production Starts in Ilam’s Azar Oilfield

Early Production Starts in Ilam’s Azar Oilfield

In line with the policy to prioritize development of joint oilfields, the first phase of production from Azar Oilfield in the west, with the capacity of 15,000 barrels per day has commenced after a long delay.
Oil Minister Bijan Namdar Zanganeh made the statement on Tuesday on the sidelines of a ceremony to start the oilfield's development in Mehran, Ilam Province, near the border with Iraq, Shana reported.
The field holds 2.5 billion barrels of crude oil and is expected to produce up to 65,000 bpd as soon as the second phase is completed in 2018, Zanganeh said.
It is one of the six joint fields with Iraq, along with Dehloran, West Paydar, Naft-Shahr, Azadegan and Yadavaran.
Pointing to the extended delay, he said, Russia’s oil company Lukoil, Norway's renewable energy company Norsk Hydro ASA, Malaysia's Petronas and Russia's Gazprom were among companies that started developing the oilfield in 2003, but work was delayed due to the international restrictions.
"It was in 2013 that the National Iranian Oil Company signed a contract with a domestic consortium including the Oil Industry Pension Fund Investment Company, also known as OPIC, a subsidiary of the Oil Ministry, Oil Industries Engineering and Construction (OIEC) and Sarvak Azar Engineering and Development Company. The consortium was commissioned to produce around 30,000 bpd from the field in three years. Nonetheless, due to the complex geological structure of the field, the venture was further delayed."
Underscoring the fact that the field was considered a drillers' nightmare given the sequence of its low- and high-pressure layers, and the large number of tubes for drilling and lining of the wells, the minister said hydraulic fracturing was another challenge in the field, which was solved with acid fracturing, a popular method for improved oil recovery.
Zanganeh noted that crude from the field will be transferred to Dehloran refining facility in Ilam Province to be shipped to target destinations.
Asked about Azar Oilfield's crude quality, he said the oil's API, a measure of how heavy or light a petroleum liquid is compared to water, stands at 33.

Short URL : https://goo.gl/JZ2rGn
  1. https://goo.gl/k6tPtT
  • https://goo.gl/iWpM0E
  • https://goo.gl/40aitk
  • https://goo.gl/7HRALX
  • https://goo.gl/ki0HYW

You can also read ...

Iran Oil Minister Plays Down Total's Exit From Binding Gas Deal
Iranian Oil Minister Bijan Namdar Zanganeh says Total S.A.'s...
NIOC has concluded MoUs with Austria’s OMV and Thailand’s PTTEP for undertaking surveys on the oilfield.
Singapore-based Berlanga Group has signed a memorandum of...
Essar’s Oct. Iran Oil Imports Fall
Indian private refiner Essar Oil’s imports from Iran fell by...
Tehran and Dushanbe have discussed the idea of using tracts of land in Tajikistan for cultivating crops to be imported back to Iran.
In his first overseas trip as Iran's energy minister, Reza...
Just two offshore companies accounted for 45% of the total owed creditors this year.
Offshore oil drilling and services companies, hurt by the...
IEA: US to See Most Crude Output Growth in 10 Years
The United States is expected to account for more than 80% of...
S. Arabia’s Falih: 50% of Excess Oil Remain
The world will still have a surplus of oil by the end of March...
Oil Prices Set for Weekly Fall
Oil prices rose on Friday but remained en route for their...

Add new comment

Read our comment policy before posting your viewpoints

Image CAPTCHA
Enter the characters shown in the image.

Trending

Googleplus