IGAT-6 Expansion Contract Signed

IGAT-6 Expansion Contract Signed

Alireza Gharibi, managing director of Iran Gas Engineering and Development Company, said on Monday, "Build-Operate-Transfer contract to expand Iran Gas Trunkline-6—aka IGAT-6—was finally signed between Gas Engineering and Development Company and Pasargad Energy Development Company," Shana reported. The project includes laying 590 km of pipeline in addition to installing five pressure regulating gas stations at an estimated cost of $2.2 billion. The project is due to finish in two years.   


Short URL : http://goo.gl/snt8y4

You can also read ...

No Plan to Increase Oil Production in Next 12 Months
Iran does not intend to increase crude output in the next...
Gasoline Production Hits Record
Iran's gasoline production has hit a record with 77.4 million...
By 2025, the length of Iran’s gas pipelines should increase by 9,000 km.
Over 182 billion cubic meters of natural gas were supplied...
Budget Cut to Cause  Drastic Oil Reduction
Narsi Ghorban, a prominent Iranian energy analyst from London...