SOCAR to Build New  Platform in Caspian Sea

SOCAR to Build New Platform in Caspian Sea

Azerbaijan’s state energy company SOCAR plans to construct a new platform on the Darwin Bank field in the Azerbaijani sector of the Caspian Sea by late 2015, Azer News reported.
Neftqaztikinti (Oil & Gas Building Trust) will be the main contractor for the construction of the stationary offshore platform No. 790, the company said.
An expected daily production volume of each well to be drilled from this platform will be five metric tons. The platform is designed for drilling 14 development wells. The modern drilling equipment, wagon-type houses for 37 people, two cranes with a lifting capacity of 25 tons, a fire prevention system and an anti-corrosion system, diesel generators for power supply and other equipment will be installed on the platform.
Jointly with foreign partners, SOCAR participates in large projects including development of Azeri-Chirag-Guneshli oil and gas fields’ block and Shah Deniz gas condensate field in the Caspian Sea.


Short URL : http://goo.gl/uzkNjg

You can also read ...

No Plan to Increase Oil Production in Next 12 Months
Iran does not intend to increase crude output in the next...
Gasoline Production Hits Record
Iran's gasoline production has hit a record with 77.4 million...
By 2025, the length of Iran’s gas pipelines should increase by 9,000 km.
Over 182 billion cubic meters of natural gas were supplied...
Budget Cut to Cause  Drastic Oil Reduction
Narsi Ghorban, a prominent Iranian energy analyst from London...