Sci & Tech
0

Artemis 3 Moon Mission Could Be Delayed to 2026

Artemis 3 Moon Mission May Be Delayed to 2026
Artemis 3 Moon Mission May Be Delayed to 2026

NASA is worried that SpaceX's giant new Starship vehicle won't be ready to carry astronauts to the surface of the moon in late 2025, as currently planned.
In 2021, the agency selected Starship — the biggest and most powerful rocket ever built — to be the first crewed lunar lander for its Artemis program of moon exploration. 
Starship will put astronauts down near the ice-rich lunar south pole on the Artemis 3 mission, in humanity's first return to the moon since the Apollo program ended in 1972. Artemis 3 is currently targeted to lift off in December 2025, but it's unlikely Starship will be able to meet that timeline, NASA officials said.
December 2025 "is our current manifest date, but with the difficulties that SpaceX has had, I think that's really, really concerning," Jim Free, NASA's associate administrator for exploration systems development, said on June 7 during a joint meeting of the US National Academies' Aeronautics and Space Engineering Board and its Space Studies Board, the online space publication Space.com reported.
"So, you can think about that slipping probably into '26," he added.
A fully stacked Starship launched for the first time ever in April, soaring high into the skies above South Texas on an epic, highly anticipated test mission. 
The flight aimed to send Starship's upper stage most of the way around Earth, wrapping up with an ocean splashdown near Hawaii. But the vehicle's two stages failed to separate as planned, and SpaceX ordered Starship's destruction over the Gulf of Mexico less than four minutes after liftoff.
It's unclear when Starship will fly again; several boxes must be checked first. For example, the US Federal Aviation Administration (FAA) is still investigating the launch mishap, with SpaceX's help. And a coalition of environmental groups is suing FAA, claiming the agency didn't properly assess the damage Starship launches could inflict on the surrounding ecosystem.  
A relatively quick return to flight would be necessary for Artemis 3 to have any chance of meeting the 2025 target because, as Free noted, SpaceX must conduct a number of Starship launches before the vehicle starts carrying Artemis astronauts.
Each Starship that heads for the moon, for instance, must be fueled in a "depot" in Earth orbit by several other Starship tanker vehicles. And SpaceX will send an uncrewed Starship to the lunar surface and back ahead of Artemis 3, to demonstrate the craft's safety and readiness for crewed flight.
"If you figure they need a number of launches to do their depot for our crewed flight, they need a number of launches to do the demo, they need a number of launches just to get flying — they have a significant number of launches to go, and that of course gives me concern about the December of 2025 date," Free said.
The Artemis program aims to establish a permanent, sustainable human presence on and around the moon by the end of the 2020s. NASA believes the skills and knowledge gained by achieving this will help the agency send astronauts to Mars in the late 2030s or early 2040s.
One Artemis mission has lifted off to date — Artemis 1, which sent an uncrewed Orion capsule to lunar orbit and back last fall. Artemis 2 is slated to launch astronauts around the moon in late 2024, again using Orion and NASA's Space Launch System megarocket, the latter of which debuted on Artemis 1. 
Orion had flown once before, on a test flight to Earth orbit in 2014.

Add new comment

Read our comment policy before posting your viewpoints

Financialtribune.com